After you have prepared the feasibility report under discussion, proceed with next steps of in-house EHR development – Designing (list of functions to be included), Building (programming – coding and assembling), Testing (for required functionalities and errors correction), and Activation (Go-Live) – of the EHR system using the SDLC model. Which of the two SDLC models (waterfall, iterative) would you consider for the EHR development and why? Apply your selected SDLC model to EHR development and write a report for the management.The report should analyze the activities pertinent to in-house EHR development phases of Planning, Feasibility, Designing, Building, Testing, Activation, and Maintenance from the leadership and managerial positions.
Your APA formatted report comprising 2-4, double-spaced, typed in 12-point Times New Roman (or 11- point Calibri) excluding the Cover and Reference pages should be submitted by Tuesday midnig
Your APA formatted report comprising 2-4, double-spaced, typed in 12-point Times New Roman (or 11- point Calibri) excluding the Cover and Reference pages should be submitted by Tuesday midnig