Write a scope statement that contains (at a minimum) the following relevant parameters of cell phone tower complex construction:
location requirements (free standing, roof-top, water tower, disguised, etc)
physical address of the acquired site
area encompassed by the project location (square footage, acres, etc.)
tower height
tower construction type (monopole, helical, etc.)
other construction materials needed (stone, concrete, fencing, paint, cabling, antennas, etc