Design a plan for capacity management, production planning, and scheduling

Words: 274
Pages: 1
Subject: Uncategorized

Course Objectives:

CO5: Design a plan for capacity management, production planning, and scheduling
CO8: Compose the results of operations and case studies effectively in writing the results of operations analysis and case studies
Prompt:
According to the assigned case study, Lawn King must develop an S&OP plan that considers the costs of inventory, overtime, hiring, and layoff (beware of stock outs). If the plan results in back orders, Lawn King will have to incur greater costs later in the year to meet demand. Analyze the case study and answer the following questions:

Review the forecast in Exhibit 3. Does it seem reasonable, based on past demand and input from the Marketing Department? What concerns do you likely have?
Develop a S&OP plan by month for fiscal year 2020. Consider the use of several different production strategies. Which strategy do you recommend? Use of Excel will greatly save time in making these plans.
Instructions:

Label your Word document as follows: yourlastname.doc (ex: Johnson.docx)
The paper should be at least 1,000-words
The paper should be APA-compliant paper comprising your response
Minimum 5 full pages of content (Word Document) of strategic material (does not include cover page, abstract, nor reference pages)
All charts, graphs, pictures are to go in the appendix (not a substitute for content)
The paper must provide inline citations to at least five scholarly sources supporting your paper
Refrain from excessive use of quotes in your response (less than 5%)
Once you submit your document to the assignment folder it will automatically be loaded to TURNITIN.COM within the course. Your similarity scan score must be 20% or less (the following will be excluded: headers, bibliography, etc. prior to instructor grading paper—focus on the content of scan percentage
Plagiarism will result in an automatic zero for this assignment
There are no late assignments accepted after the last day of the courseCourse Objectives:

CO5: Design a plan for capacity management, production planning, and scheduling
CO8: Compose the results of operations and case studies effectively in writing the results of operations analysis and case studies
Prompt:
According to the assigned case study, Lawn King must develop an S&OP plan that considers the costs of inventory, overtime, hiring, and layoff (beware of stock outs). If the plan results in back orders, Lawn King will have to incur greater costs later in the year to meet demand. Analyze the case study and answer the following questions:

Review the forecast in Exhibit 3. Does it seem reasonable, based on past demand and input from the Marketing Department? What concerns do you likely have?
Develop a S&OP plan by month for fiscal year 2020. Consider the use of several different production strategies. Which strategy do you recommend? Use of Excel will greatly save time in making these plans.

Let Us write for you! We offer custom paper writing services Order Now.

REVIEWS


Criminology Order #: 564575

“ This is exactly what I needed . Thank you so much.”

Joanna David.


Communications and Media Order #: 564566
"Great job, completed quicker than expected. Thank you very much!"

Peggy Smith.

Art Order #: 563708
Thanks a million to the great team.

Harrison James.


"Very efficient definitely recommend this site for help getting your assignments to help"

Hannah Seven