Evaluate your process using either lean concepts to find ways to eliminate waste and improve the process and/or SQC or Six Sigma to reduce defects or variances in the process Then complete the following in Excel: chart and Compute the defined process metrics including process capability and process variation.
Create and display a control chart for the process.
Analyze the control process metrics using Statistical Quality/Process Control (SQC) methods.
Decide whether the process could benefit from the use of Six Sigma, Lean, or other tools.
(Include all calculation and charts)
Phase 3- Executive Summary
Write a 700-to-850-word executive summary which includes the following:
A brief descriiption of the process based on the flowchart of processes current state. Explain the results of your process evaluation and how the weak points can be strengthened. Include a descriiption of the process improvement technique(s) used.
Provide a brief descriiption of future state process improvements
Using the metrics chosen to evaluate process current state estimate how you anticipate the future process will perform.
Provide a brief descriiption of your process improvement project to achieve the process future state
A summary of the Process Evaluation (using either Lean or SQC or Six Sigma)
A summary of the evaluation of the control chart and process metrics based on other tools
A descriiption of the SQC project and recommendations.