Project Quality Mgt
Read “Measuring Up”, by John Buchanan, PM Network, Sep 2008, p 50-55
Write a brief synopsis of the article listed above by identifying 2-3 major points of
wisdom that you wish to consider in your Senior Design Project and why these points.
(200-3000 words each article)
Also answer
Why do projects have problems or even fail, and what metrics can be used to measure it?
What are the lessons that Chirwan Gahun (American Chemical Society) learned in his
project performance metrics?
List the benefits of applying project metrics in different organizations.
Read “Measuring Up”, by John Buchanan, PM Network, Sep 2008, p 50-55
• Write a brief synopsis of the article listed above by identifying 2-3 major points of wisdom that you wish to consider in your Senior Design Project and why these points. (200-3000 words each article)
Also answer
• Why do projects have problems or even fail, and what metrics can be used to measure it?
• What are the lessons that Chirwan Gahun (American Chemical Society) learned in his project performance metrics?
• List the benefits of applying project metrics in different organizations.